CO129-355 - Governor Sir Lugard - 1909 [1-3] — Page 180

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

550

XY ¿BI of bed fank

Mando

#

**

#afr

178

Jolonial

difficulty would only be increased. Mr. Barry quoted the Shanghai-Nanking Railway Agreement and promised to let me have a copy of it. I said that there was no railway the Chinese so detested, but Mr. Barry agreeing thoroughly said the reason was not because of its management which had worked without friction but because it was the only railway in China in which the shareholders and foreigners shared profits. In that Agreement if even a minority disagree the matter may be referred to the two Governments, and finally to the British Minister as Arbitrator. There had never yet been a case of reference.

I asked Mr. Barry's view on appointment Tunnel Shaft. He said more trouble would result. The separate use of the two shafts Mr. Barry strongly recommended that this should not be filled up but retained for ventilation and lined at a cost of £300. The matter had never been brought forward by Mr. Eves, Mr. Ives retired, and I raised further questions re the staff.

Coming to Waite. Mr. Barry supported a bonus being given to Waite for good work on construction of the Tunnel. He has reduced the cost of the heading from $70 to $50 per foot since he came besides making much more rapid progress. He saw no reason for giving a bonus to any one else.

Staff.

Mr. Barry thought that the Staff could be reduced (at any rate as soon as the loading was through, and the District Engineer could walk through the tunnel instead of going over the hills to supervise both North and South of the tunnel) as follows:- 1 Chief Resident Engineer, 1 District Engineer (Logan) 2 Assistants (one on each side) Stein and one to be engaged. 1 Assistant for the Tunnel (Southey). Messrs. Baker and Mipy are no longer required.

I asked Mr. Barry's view as to Mr. Eves looking to the report he is about to make on the bridges &c. He said it was solely a matter...

Page 180

Page 181

Edit History

2026-06-07 20:31:57 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
550 XY ¿BI of bed fank Mando # ** #afr 178 Jolonial difficulty would only be increased. Mr. Barry quoted the Shanghai-Nanking Railway Agreement and promised to let me have a copy of it. I said that there was no railway the Chinese so detested, but Mr. Barry agreeing thoroughly said the reason was not because of its management which had worked without friction but because it was the only railway in China in which the shareholders and foreigners shared profits. In that Agreement if even a minority disagree the matter may be referred to the two Governments, and finally to the British Minister as Arbitrator. There had never yet been a case of reference. I asked Mr. Barry's view on appointment Tunnel Shaft. He said more trouble would result. The separate use of the two shafts Mr. Barry strongly recommended that this should not be filled up but retained for ventilation and lined at a cost of £300. The matter had never been brought forward by Mr. Eves, Mr. Ives retired, and I raised further questions re the staff. Coming to Waite. Mr. Barry supported a bonus being given to Waite for good work on construction of the Tunnel. He has reduced the cost of the heading from $70 to $50 per foot since he came besides making much more rapid progress. He saw no reason for giving a bonus to any one else. Staff. Mr. Barry thought that the Staff could be reduced (at any rate as soon as the loading was through, and the District Engineer could walk through the tunnel instead of going over the hills to supervise both North and South of the tunnel) as follows:- 1 Chief Resident Engineer, 1 District Engineer (Logan) 2 Assistants (one on each side) Stein and one to be engaged. 1 Assistant for the Tunnel (Southey). Messrs. Baker and Mipy are no longer required. I asked Mr. Barry's view as to Mr. Eves looking to the report he is about to make on the bridges &c. He said it was solely a matter... Page 180 Page 181
Baseline (Original)
550 XY ¿BI of bed fank Mando # ** #afr 178 Jolonial difficulty would only be uncertusted. Ur. Barry quoted the Shanghai-Nanking Bellway Agreement and promised to let me have a copy of it. I said that there was no railway the Chinese ao detestad, but Mr. Barry agreeing thoroughly sală tua reason was not baceuse of its Vanag ment which Secretary we out that on had worked without friction but because it was the only tical grounds I there was oby extion chinear a Bhman; that Kineer would were to insist Eichenial as Man and that- railway in China in which the sheroholders and foreignora shared profits. In that Agreement if even a minority dis- -agree the matter may be referred to the two Governments, and firally to the British Vinister as Arbitrator. There had never yat heon a case of refararco. i on appointment Tunr:al Shaft. thead & more how and trouble would peruet The separate Joe of the two Mr. Farry strongly recommended thut this should not be filled up M retained for ventil8- -lon and lined &t a cost of £300. The ratter had never ben brought for ard by Fr. Eves, Ar. Ives retired, and I reised I. ? Styroge vão w«i badoin, u montido edi r talk Aquaris vaentami tald aesond bar wele to jalog esantno further questions re the staff. Conus to Waite. Kr. Barry stuported a homis being given to Vaite for gord work on coqlation of the Tunnel. He has reduced the cost of the honding from $70 to $50 per foot since he came besides making much more rapid progress. He saw no reason for giving a bonus to any one else. Staff. Mr. Darry thought that the Staff could be reduced (at any rate as soon as the loading VAS through, and the District Engineer could walk through the tunnel instead of going over the hills sai so supervise both Worth and South of the tunnel) as follows:- 1.Chief Resident Engineer, i Distries Mucinour (Logar) 2 Assiutants (one on each side) Steiz and one to be engegod. 1 Annistaut for the Bunnel (Southey). Haasra. Baker and Mipy aro no longer required. 14. Evno'a workit I asked 17. Barry's view as to +3'ndaẳng 777. Zves looking to the repurt he is about to lcke on she bridges &G. He ahid it was nolely a mandar for Page 180Page 181
2026-06-07 20:31:57 · Baseline
View content

550

XY ¿BI of bed fank

Mando

#

**

#afr

178

Jolonial

difficulty would only be uncertusted. Ur. Barry quoted the Shanghai-Nanking Bellway Agreement and promised to let me have a copy of it. I said that there was no railway the Chinese ao detestad, but Mr. Barry agreeing thoroughly sală tua reason was not baceuse of its Vanag ment which

Secretary we out that on had worked without friction but because it was the only

tical grounds

I there was

oby extion

chinear

a

Bhman; that Kineer would were to insist Eichenial

as

Man and that-

railway in China in which the sheroholders and foreignora shared profits. In that Agreement if even a minority dis- -agree the matter may be referred to the two Governments, and firally to the British Vinister as Arbitrator. There

had never yat heon a case of refararco.

i on appointment Tunr:al Shaft.

thead & more

how and trouble

would peruet

The separate

Joe of the two

Mr. Farry strongly recommended

thut this should not be filled up M retained for ventil8-

-lon and lined &t a cost of £300. The ratter had never

ben brought for ard by Fr. Eves,

Ar. Ives retired, and I reised

I.

?

Styroge

vão w«i badoin, u montido edi

r

talk Aquaris vaentami tald

aesond bar wele to jalog esantno

further questions re the staff.

Conus to Waite.

Kr. Barry stuported a homis being given to Vaite for gord work on coqlation of the Tunnel. He has reduced the cost of the honding from $70 to $50 per foot since he came besides making much more rapid progress. He saw no reason for giving a bonus to any one else.

Staff.

Mr. Darry thought that the Staff could be reduced (at any rate as soon as the loading VAS through, and the District Engineer could walk through the tunnel instead of going over the hills sai so supervise both Worth and South of the tunnel) as follows:- 1.Chief Resident Engineer, i Distries Mucinour (Logar) 2 Assiutants (one on each side) Steiz and one to be engegod. 1 Annistaut for the Bunnel (Southey). Haasra. Baker and

Mipy aro no longer required.

14. Evno'a workit

I asked 17. Barry's view as to

+3'ndaẳng 777. Zves looking to the repurt he is about to lcke on she bridges &G. He ahid it was nolely a mandar

for

Page 180Page 181