difficulty would only be increased. Mr. Barry quoted the Shanghai-Nanking Railway Agreement and promised to let me have a copy of it. I said that there was no railway the Chinese so detested, but Mr. Barry agreeing thoroughly said the reason was not because of its management which had worked without friction but because it was the only railway in China in which the shareholders and foreigners shared profits. In that Agreement if even a minority disagree the matter may be referred to the two Governments, and finally to the British Minister as Arbitrator. There had never yet been a case of reference.
I asked Mr. Barry's view on appointment Tunnel Shaft. He said more trouble would result. The separate use of the two shafts Mr. Barry strongly recommended that this should not be filled up but retained for ventilation and lined at a cost of £300. The matter had never been brought forward by Mr. Eves, Mr. Ives retired, and I raised further questions re the staff.
Coming to Waite. Mr. Barry supported a bonus being given to Waite for good work on construction of the Tunnel. He has reduced the cost of the heading from $70 to $50 per foot since he came besides making much more rapid progress. He saw no reason for giving a bonus to any one else.
Staff.
Mr. Barry thought that the Staff could be reduced (at any rate as soon as the loading was through, and the District Engineer could walk through the tunnel instead of going over the hills to supervise both North and South of the tunnel) as follows:- 1 Chief Resident Engineer, 1 District Engineer (Logan) 2 Assistants (one on each side) Stein and one to be engaged. 1 Assistant for the Tunnel (Southey). Messrs. Baker and Mipy are no longer required.
I asked Mr. Barry's view as to Mr. Eves looking to the report he is about to make on the bridges &c. He said it was solely a matter...
Page 180
Page 181
550
XY ¿BI of bed fank
Mando
#
**
#afr
照
178
Jolonial
difficulty would only be uncertusted. Ur. Barry quoted the Shanghai-Nanking Bellway Agreement and promised to let me have a copy of it. I said that there was no railway the Chinese ao detestad, but Mr. Barry agreeing thoroughly sală tua reason was not baceuse of its Vanag ment which
Secretary we out that on had worked without friction but because it was the only
tical grounds
I there was
oby extion
chinear
a
Bhman; that Kineer would were to insist Eichenial
as
Man and that-
railway in China in which the sheroholders and foreignora shared profits. In that Agreement if even a minority dis- -agree the matter may be referred to the two Governments, and firally to the British Vinister as Arbitrator. There
had never yat heon a case of refararco.
i on appointment Tunr:al Shaft.
thead & more
how and trouble
would peruet
The separate
Joe of the two
Mr. Farry strongly recommended
thut this should not be filled up M retained for ventil8-
-lon and lined &t a cost of £300. The ratter had never
ben brought for ard by Fr. Eves,
Ar. Ives retired, and I reised
I.
?
Styroge
vão w«i badoin, u montido edi
r
talk Aquaris vaentami tald
aesond bar wele to jalog esantno
further questions re the staff.
Conus to Waite.
Kr. Barry stuported a homis being given to Vaite for gord work on coqlation of the Tunnel. He has reduced the cost of the honding from $70 to $50 per foot since he came besides making much more rapid progress. He saw no reason for giving a bonus to any one else.
Staff.
Mr. Darry thought that the Staff could be reduced (at any rate as soon as the loading VAS through, and the District Engineer could walk through the tunnel instead of going over the hills sai so supervise both Worth and South of the tunnel) as follows:- 1.Chief Resident Engineer, i Distries Mucinour (Logar) 2 Assiutants (one on each side) Steiz and one to be engegod. 1 Annistaut for the Bunnel (Southey). Haasra. Baker and
Mipy aro no longer required.
14. Evno'a workit
I asked 17. Barry's view as to
+3'ndaẳng 777. Zves looking to the repurt he is about to lcke on she bridges &G. He ahid it was nolely a mandar
for